<?xml version="1.0" encoding="UTF-8"?> <rss
version="2.0"
xmlns:content="http://purl.org/rss/1.0/modules/content/"
xmlns:wfw="http://wellformedweb.org/CommentAPI/"
xmlns:dc="http://purl.org/dc/elements/1.1/"
xmlns:atom="http://www.w3.org/2005/Atom"
xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
> <channel><title>ERP Solutions</title> <atom:link href="http://erphelpdesks.com/feed" rel="self" type="application/rss+xml" /><link>http://erphelpdesks.com</link> <description>SAP ERP Knowledge Sharing &#38; Tutorials</description> <lastBuildDate>Sun, 20 May 2012 04:03:27 +0000</lastBuildDate> <language>en</language> <sy:updatePeriod>hourly</sy:updatePeriod> <sy:updateFrequency>1</sy:updateFrequency> <generator>http://wordpress.org/?v=3.3.2</generator> <item><title>Source List Determination</title><link>http://erphelpdesks.com/sap-source-list-determination-mm.html?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=sap-source-list-determination-mm</link> <comments>http://erphelpdesks.com/sap-source-list-determination-mm.html#comments</comments> <pubDate>Sun, 20 May 2012 04:03:27 +0000</pubDate> <dc:creator>ERP</dc:creator> <category><![CDATA[Material Management]]></category> <category><![CDATA[source list determination sap mm]]></category> <category><![CDATA[source list sap mm]]></category> <guid
isPermaLink="false">http://erphelpdesks.com/?p=1017</guid> <description><![CDATA[Vendor Selection &#8211; If the source of supply was not determined in the purchase requisition (PR), the source of supply can be determined before the purchase order (PO) is created. When suggesting possible sources, the SAP system first tries to...]]></description> <content:encoded><![CDATA[<p><strong>Vendor Selection</strong> &#8211; If the source of supply was not determined in the purchase requisition (PR), the source of supply can be determined before the purchase order (PO) is created. When suggesting possible sources, the SAP system first tries to determine a suitable source on the basis of the <em>source list</em>.</p><p><strong>Source List Determination</strong></p><p><img
src="https://lh3.googleusercontent.com/-6bAfAbHjmuo/T7hs34FT9II/AAAAAAAAAWQ/ekFUELYqAH8/s547/sap-source-list-determination.jpg" alt="SAP Source List Determination" /></p><p>A source list identifies sources of supply for the certain materials and the period of time in which the material can be ordered from the source.</p><p>If the source list contains neither a vendor nor an outline agreement item, the SAP system then tries to find a contract or a scheduling agreement for the material. The SAP system also looks for suitable info records and suggests these for the material.</p><p><strong>Source List Overview</strong></p><p>A source list specifies the possible supply sources for a material over a given period of time. In the SAP system, a source for material supply can be a vendor or an outline agreement. A source list shows the time period in which a material may be ordered from a given vendor, or details of long-term purchase agreements.</p><p>The source list can be used to define the preferred or allowed sources of a material. Source list records are used in source determination, which involves automatically assigning sources to purchase requisitions.</p><p><img
src="https://lh6.googleusercontent.com/-39kTOXPyx_E/T7hs38KOt0I/AAAAAAAAAWU/hSHx0Evdylk/s620/source-list-sap-mm.jpg" alt="Source List in SAP MM" /></p><p><strong>Source List Maintenance</strong></p><p><strong>Source list record</strong>s are maintained either manually, or via the outline agreement, purchasing information record or automatic generation. Once the source list is maintained, the system will suggest the source list in requisition via the source determination facility. The purchase order (PO) and purchase requisition (PR) will then be checked to determine whether the source is allowed.</p> ]]></content:encoded> <wfw:commentRss>http://erphelpdesks.com/sap-source-list-determination-mm.html/feed</wfw:commentRss> <slash:comments>0</slash:comments> </item> <item><title>Planned Delivery Costs</title><link>http://erphelpdesks.com/planned-delivery-costs-sap-mm.html?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=planned-delivery-costs-sap-mm</link> <comments>http://erphelpdesks.com/planned-delivery-costs-sap-mm.html#comments</comments> <pubDate>Sat, 19 May 2012 14:46:10 +0000</pubDate> <dc:creator>ERP</dc:creator> <category><![CDATA[Material Management]]></category> <category><![CDATA[planned delivery costs po sap]]></category> <category><![CDATA[planned delivery costs sap mm]]></category> <guid
isPermaLink="false">http://erphelpdesks.com/?p=1027</guid> <description><![CDATA[Planned delivery costs are costs which are known before create a purchase order (PO). Planned delivery costs include transportation costs, insurance costs or customs clearance costs. These costs will be maintained in the pricing conditions of the outline agreement or...]]></description> <content:encoded><![CDATA[<p><strong>Planned delivery costs</strong> are costs which are known before create a purchase order (PO). Planned delivery costs include transportation costs, insurance costs or customs clearance costs.</p><p>These costs will be maintained in the pricing conditions of the outline agreement or if no outline agreement exists, it will be in the <a
href="http://erphelpdesks.com/sap-purchasing-information-record-erp.html"  title="SAP Purchasing Information Record (PIR)" target="_blank">purchasing info record</a>.</p><p>Each condition (the transportation costs, for example) can have a different vendor from the main vendor supplying the goods. At the time of purchase order creation with reference to the contract or info record, the pricing conditions will be copied into purchase order&#8217;s pricing conditions and may be maintained there.</p><p>At the time of invoice posting, the SAP system will use the conditions in the purchase order to calculate the due amount and compare it with the received invoice from the service vendors.</p><p>If a mismatch exists between the service supplier invoice and the condition in the purchase order, and this variance is deemed significant, the respective condition in the info record and PO will be updated.</p><p><em>If the variance is small and not significant, the invoice will be posted, where the difference will go to price difference account.</em></p> ]]></content:encoded> <wfw:commentRss>http://erphelpdesks.com/planned-delivery-costs-sap-mm.html/feed</wfw:commentRss> <slash:comments>0</slash:comments> </item> <item><title>Inconsistencies for prod.vers</title><link>http://erphelpdesks.com/sap-inconsistencies-for-prod-vers.html?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=sap-inconsistencies-for-prod-vers</link> <comments>http://erphelpdesks.com/sap-inconsistencies-for-prod-vers.html#comments</comments> <pubDate>Thu, 17 May 2012 13:07:21 +0000</pubDate> <dc:creator>ERP</dc:creator> <category><![CDATA[ERP Solutions]]></category> <category><![CDATA[production version sap]]></category> <guid
isPermaLink="false">http://erphelpdesks.com/?p=1046</guid> <description><![CDATA[I created new production version for a material by using C223 transaction. After clicked &#8220;consistency check&#8221; button for this production version, I got the error &#8220;Inconsistencies for prod.vers.&#8221; What is cause of this problem? I am searching the solution in...]]></description> <content:encoded><![CDATA[<p>I created new <a
target="_blank" rel="nofollow" href="http://erphelpdesks.com/goto/http://help.sap.com/saphelp_46c/helpdata/en/ff/515fc549d811d182b80000e829fbfe/content.htm"  title="production version sap" target="_blank">production version</a> for a material by using C223 transaction. After clicked &#8220;consistency check&#8221; button for this production version, I got the error &#8220;<strong>Inconsistencies for prod.vers.</strong>&#8221;</p><p>What is cause of this problem? I am searching the solution in SAP forum then I have got the solution now. To solve this issue, I checked the following steps:</p><p><img
src="https://lh3.googleusercontent.com/-FbkgYIbdzuw/T7T3srK0vgI/AAAAAAAAASo/msDKdSL96JY/s601/inconsistencies_for_production_version%252Bsap.jpg" alt="sap inconsistencies for prod.vers" /></p><p>1. Check the validity dates for the routing and production version. Rate Routing Valid from 15.07.2012, whereas you may be defining valid from of Production Version from 15.06.2012, in this case you may get 2 messages during the consistency check of production version, system will display message tasklist exists and next &#8220;No valid Task List&#8221; for period 15.06.2012. (For my case, valid date of production version and rate routing is matched.. What next?)</p><p>2. I re-checked my rate routing again and found the cause of this inconsistencies. It is because I have updated unit of measure of lot size as &#8220;PC&#8221; but unit of measure of lot size in production version is &#8220;CS&#8221;. So that means lot size is not matched.</p><p>I have updated UoM in rate routing to &#8220;CS&#8221; and consistency check this production version again. The green light is coming.</p><p>inconsistencies for production version+sap &#8211; This solution should be helpful any one who find this issue. I also welcome any comments and sharing.</p><p>Read more: <a
target="_blank" rel="nofollow" href="http://erphelpdesks.com/goto/http://help.sap.com/saphelp_46c/helpdata/en/89/a42403461e11d182b50000e829fbfe/content.htm"  target="_blank">Production Version</a></p> ]]></content:encoded> <wfw:commentRss>http://erphelpdesks.com/sap-inconsistencies-for-prod-vers.html/feed</wfw:commentRss> <slash:comments>0</slash:comments> </item> <item><title>Tip: How to Set Required Field for Standard SAP Report</title><link>http://erphelpdesks.com/tip-how-to-set-required-field-for-standard-sap-report.html?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=tip-how-to-set-required-field-for-standard-sap-report</link> <comments>http://erphelpdesks.com/tip-how-to-set-required-field-for-standard-sap-report.html#comments</comments> <pubDate>Sat, 12 May 2012 15:02:53 +0000</pubDate> <dc:creator>ERP</dc:creator> <category><![CDATA[ERP Solutions]]></category> <category><![CDATA[sap tips for users]]></category> <guid
isPermaLink="false">http://erphelpdesks.com/?p=1044</guid> <description><![CDATA[Sometime we need to set some field in standard SAP report as required field. For example, I need to set company code field in vendor line item report (FBL1N transaction) to be required field. So is it possible to do...]]></description> <content:encoded><![CDATA[<p>Sometime we need to set some field in standard SAP report as required field. For example, I need to set company code field in vendor line item report (FBL1N transaction) to be required field. So is it possible to do that?</p><p>Yes.. to do that variant has be to create for this transaction. Go to FBL1N transactions and click on save icon (to save your variant). In variant attributes, select required field indicator at company code line, design your variant name and save as default variant.</p><p><img
src="https://lh5.googleusercontent.com/-353jIW17DHw/T6567Zt9ppI/AAAAAAAAASU/_8k6OghpjEI/s831/variant-attributes-sap.jpg" /></p><p><img
src="https://lh4.googleusercontent.com/-bO1yLjC4ILU/T65655BuqmI/AAAAAAAAASM/2CeFH-tZmR4/s635/fbl1n-sap.jpg" /></p> <strong>RECENT SEARCH TERMS</strong><br
/> • sap add purchase order number to FBL1N • how to add line iteam for fbl1n standard]]></content:encoded> <wfw:commentRss>http://erphelpdesks.com/tip-how-to-set-required-field-for-standard-sap-report.html/feed</wfw:commentRss> <slash:comments>0</slash:comments> </item> <item><title>SAP Component Scrap Calculation</title><link>http://erphelpdesks.com/sap-component-scrap-calculation.html?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=sap-component-scrap-calculation</link> <comments>http://erphelpdesks.com/sap-component-scrap-calculation.html#comments</comments> <pubDate>Sat, 12 May 2012 14:26:57 +0000</pubDate> <dc:creator>ERP</dc:creator> <category><![CDATA[ERP Solutions]]></category> <category><![CDATA[component scrap in bom sap]]></category> <category><![CDATA[component scrap sap]]></category> <category><![CDATA[cost estimate material incorrect sap]]></category> <guid
isPermaLink="false">http://erphelpdesks.com/?p=1039</guid> <description><![CDATA[As checking quantity of component part will be used in BOM. Let say material A will consume component B 1 ea. But when run cost estimate by using CK11N transaction, system calculated by consuming component B 2 ea. Why cost...]]></description> <content:encoded><![CDATA[<p><em>As checking quantity of component part will be used in BOM. Let say material A will consume component B 1 ea. But when run cost estimate by using CK11N transaction, system calculated by consuming component B 2 ea. <strong>Why cost estimate material incorrect in SAP?</strong></em></p><p>This problem might be caused by component scrap value in material master of material A. If assembly material master is updated the component scrap in percent field on MRP4 view. Thus this scrap percentage will be used to be calculated and it makes the cost estimate increased.</p><p><strong>Component scrap (%)</strong> parameter is also used in material requirement planning (MRP) to determine the quantities of component required. When exploding the bill of material (BOM), the SAP system will increase the required quantities of the components by calculated scrap quantity.</p><p>For example, If material A is required quantity 500 pieces and component scrap in percent is maintained as 10%. Then scrap quantity will be 50 pieces. Therefore, 556 ( 555.555.. ) pieces are required.</p><p>Read more information: <a
href="http://erphelpdesks.com/component-scrap-bom-sap.html"  title="Component Scrap BOM in SAP" target="_blank">Component Scrap BOM in SAP</a></p> <strong>RECENT SEARCH TERMS</strong><br
/> • sap parameter scrap • sap component scrap calculation • scrap calculation sap]]></content:encoded> <wfw:commentRss>http://erphelpdesks.com/sap-component-scrap-calculation.html/feed</wfw:commentRss> <slash:comments>0</slash:comments> </item> <item><title>No Message Generated Output in Purchase Order</title><link>http://erphelpdesks.com/sap-no-message-generated-output-in-purchase-order.html?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=sap-no-message-generated-output-in-purchase-order</link> <comments>http://erphelpdesks.com/sap-no-message-generated-output-in-purchase-order.html#comments</comments> <pubDate>Sat, 12 May 2012 09:03:52 +0000</pubDate> <dc:creator>ERP</dc:creator> <category><![CDATA[ERP Solutions]]></category> <category><![CDATA[output condition type sap]]></category> <guid
isPermaLink="false">http://erphelpdesks.com/?p=1029</guid> <description><![CDATA[If you find that there is no output type assigned automatically in your purchase order. The first thing to check is output type should be maintained properly in Output &#8211; Condition Records: Purchase Order ( transaction MN04 &#8211; Create, MN05...]]></description> <content:encoded><![CDATA[<p>If you find that there is no output type assigned automatically in your purchase order. The first thing to check is output type should be maintained properly in <strong>Output &#8211; Condition Records: Purchase Order</strong> ( transaction MN04 &#8211; Create, MN05 &#8211; Change and MN06 &#8211; display )</p><p>For this case, I have checked my output type by using MN06 transaction. <strong>Key Combination</strong> (Purchasing Doc. Type and Company Code) is maintained properly and some purchase order that are using this output group can work correctly ( output is created automatically in message ).</p><p>I have investigated deeply and found that only purchase orders which created with one purchasing group (for example this case is T10) has this problem.</p><p>If you find the situation like this. More setting need to be checked is whether an output device has been assigned to the purchasing groups used in your purchase order or not.</p><p>• SPRO • Materials Management • Purchasing • Messages • Assign Output Devices to Purchasing Groups</p><p>For my case, this missing configuraiton is cause of output not triggering automatically for any purchase orders created with this purchasing group. Then I restored the configuration. I refreshed purchase order by using ME22N transaction and click the message button then output was assigned to my PO automatically again. So the problem is solved.</p><p>Hope this solution is useful for anyone who is encountering same issue. Any mistake, please share..</p><p><strong>What is dispatch time?</strong></p><p>1 &#8211; Send with periodically scheduled job<br
/> 2 &#8211; Send with job, with additional time specification<br
/> 3 &#8211; Send with application own transaction<br
/> 4 &#8211; Send immediately (when saving the application)</p><p>If selected &#8220;3&#8243;, output will be printed later by using ME9F transaction (not print immediately)</p><p>Other configuration need to be checked: <a
href="http://erphelpdesks.com/sap-partner-function-determination-sap.html"  title="Partner Function Determination" target="_blank">Partner Function Determination</a></p><p>No message generated for output of purchasing document<br
/> Message no. 06261</p><p>Diagnosis<br
/> The system was not able to find a message record via the message determination schema. Therefore it was not possible for such a record to be generated for this purchasing document. In consequence, the purchasing document cannot be outputted (printed or transmitted).</p> <strong>RECENT SEARCH TERMS</strong><br
/> • send immediately in sap mm message • how to know the printed output generated from which sap transaction • message no 06261 in sap • message output types change logsfor po in sap • output log in send immediately option in sap • sap help output send immediately (when saving the application)]]></content:encoded> <wfw:commentRss>http://erphelpdesks.com/sap-no-message-generated-output-in-purchase-order.html/feed</wfw:commentRss> <slash:comments>0</slash:comments> </item> <item><title>How to Remove Batch Management Indicator</title><link>http://erphelpdesks.com/sap-remove-batch-management-indicator.html?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=sap-remove-batch-management-indicator</link> <comments>http://erphelpdesks.com/sap-remove-batch-management-indicator.html#comments</comments> <pubDate>Tue, 08 May 2012 16:07:06 +0000</pubDate> <dc:creator>ERP</dc:creator> <category><![CDATA[ERP Solutions]]></category> <category><![CDATA[batch management in sap material master]]></category> <guid
isPermaLink="false">http://erphelpdesks.com/?p=1001</guid> <description><![CDATA[If you select batch management indicator in material master and there is some transaction post to this material master. Then you cannot deselect this indicator by using MM02 transaction anymore. In technically, Batch Management indicator can be removed but there...]]></description> <content:encoded><![CDATA[<p>If you select <strong>batch management indicator</strong> in material master and there is some transaction post to this material master.</p><p>Then you cannot deselect this indicator by using MM02 transaction anymore. In technically, Batch Management indicator can be removed but there are so many prerequisite steps need to be done.</p><p>Sometime the way to create new materials may be easier than going thru all complex steps need to be done to remove batch managment.</p><p>The following are the steps to <em>remove Batch Management indicator in material master</em>:</p><p><strong><u>How to deactivate batch management in SAP</u></strong></p><ol><li>Zero stock in present and previous period &#8211; Movement type 562 by using MIGO transaction or Peform Physical Inventory postings using MI10 transaction; Movement type 702.</li><li>No purchase orders &#8211; You need to delete all purchase orders lines (for open and closed POs) &#8211; List all POs by using ME2M transaction then PO line items have to be deleted by using ME22N transaction. If you have POs with GRs posted but invoices not posted, then post their invoices first, also any delivery costs should be settled. For POs with some GR done, order quantity should be reduced to match GR qty. After this only, you will be able to delete PO lines. Else, you will be hindered.</li><li>No open physical inventory documents &#8211; List all physical inventory documents by using MI22 transaction, If at all any documents are open, you will have to complete them by posting the differences or deleting them. There are chances of having open documents only if counting is being carried out presently.</li><li>All batches to be deleted at plant level and batch stock level by MSC2N transaction.</li><li>Batches to be archived.</li><li>Remove Batch Management indicator in material master.</li><li>Stock to be reloaded &#8211; Movement type 561 by using MIGO transaction or Peform Physical Inventory postings using MI10 transaction; Movement type 701.</li></ol><p><strong>More information</strong>:</p><p><strong>Note 533383</strong> – Deselecting the batch management requirement indicator<br
/> and <strong>Note 30656</strong> – Change base unit of measure/batch mngt requirement</p><p>Below points should be concerns if you need to deactivate batch management indicator.</p><p>• Check the Status of Material in MMBE transaction for total batches of the material.<br
/> • There should not be any open Purchase Order Use SE16 &amp; Table EKPO to find the Open POs<br
/> • There should not be any Sales Order. Use SE16 &amp; Table VBAP to find the Open Sales Orders<br
/> • There should not be any Purchase Requisition. Use SE16 &amp; Table EBAN to find the Open PRs<br
/> • There should be no Stock in Transit &#8211; MB5T transaction<br
/> • There should be no Plant availability Stock &#8211; MB53 transaction<br
/> • There should be no Reservation &#8211; MB25 transaction<br
/> • Previous Period Stock should be zero. Use MM43 with Plant Stock &amp; Storage Loc. View. If Stock Exists follow the Procedure:</p><ul>1. If previous period stocks exist, we can make a withdrawal posting as follows. Post the same amount to current period stock (for example, using movement type 561) so that previous period stock and current period stock are identical.<br
/> 2. Make a withdrawal posting in the previous period for the stock together with posting date (for example, using movement type 562).</ul><p>• Stock requirement should be zero &#8211; MD04 transaction<br
/> • There should be no open Delivery Use SE16 &amp; Table LIPS<br
/> • There should be no open Warehouse Transfer Request Use SE16 &amp; Table LTBP or LTAP<br
/> • The Batch Corresponding to the plant for the article has to be set for deletion indicator, MSC2N transaction. Once the batch deletion indicator is set, Archive all batches for the material<br
/> • If any of the above Stock Exists it has to be closed; If Any of the stock exists we cannot uncheck the batch management indicator.<br
/> • After closing all the open items; the related business documents such as Purchase Orders, Delivery, etc.. have to be archived.</p> <strong>RECENT SEARCH TERMS</strong><br
/> • how to remove batch management in material master in sap • delete sap batch • how to delete stock requirements in sap • change batch management after transaction sap • deleting batch in blocked status in sap • mb5t optimisation • process to delete generated inventory transaction in sap • remove batch management flag from vbap • sap cancel batch • sap Change bacth managment Account document is not cleared • how to remove a batch in transaction mmbe • how to make previous period stocks zero in sap • batch indicator in material master • how to delete batch management in sap • how to clear the stock of previous period in sap • deselecting the batch management requirement indicator • deletion indicator in batches • change batch management • sap stock not batch managed]]></content:encoded> <wfw:commentRss>http://erphelpdesks.com/sap-remove-batch-management-indicator.html/feed</wfw:commentRss> <slash:comments>0</slash:comments> </item> <item><title>How to delete SNP:DepDmd objects in APO</title><link>http://erphelpdesks.com/how-to-delete-snpdepdmd-objects-in-apo.html?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=how-to-delete-snpdepdmd-objects-in-apo</link> <comments>http://erphelpdesks.com/how-to-delete-snpdepdmd-objects-in-apo.html#comments</comments> <pubDate>Tue, 01 May 2012 04:33:19 +0000</pubDate> <dc:creator>ERP</dc:creator> <category><![CDATA[SAP Advanced Planning and Optimization]]></category> <category><![CDATA[delete dependent requirement sap]]></category> <category><![CDATA[delete snp planned order]]></category> <guid
isPermaLink="false">http://erphelpdesks.com/?p=993</guid> <description><![CDATA[Today I found some dependent demand of component material (product: 1534131) in unused subcontractor (location 102038). I have tried to delete them in edit mode of /SAPAPO/RRP3 transaction but it doesn&#8217;t work.. So how to delete those demand (SNP:DepDmd elements)...]]></description> <content:encoded><![CDATA[<p>Today I found some dependent demand of component material (product: 1534131) in unused subcontractor (location 102038). I have tried to delete them in edit mode of <em>/SAPAPO/RRP3</em> transaction but it doesn&#8217;t work..</p><p>So how to delete those demand (SNP:DepDmd elements) from system since this subcontractor will not be used anymore?</p><p>SNP:DepDmd elements in subcontractor location happened due to the planned order for finished goods at this subcontractor location (vendor).</p><p><img
src="https://lh5.googleusercontent.com/-JBe-2QtGKm8/T59l86vSe1I/AAAAAAAAARw/wusFMRUIQno/s810/SNP%2520DepDmd.jpg" alt="SNP:DepDmd" /></p><p>To find what the finished goods of this product are, we can use CS15 transaction in SAP R/3.. As Material Where-Used list below, there are 3 finished goods using this material.</p><p><img
src="https://lh6.googleusercontent.com/-ujuKZaySIHo/T59l88vzIvI/AAAAAAAAAR0/fB8hYpBJqr4/s511/cs15-transaction-sap.jpg" alt="cs15 transaction sap" /></p><p>As checking, there are planned orders (SNP:PL-ORD elements) in finished goods product: 1534192 at vendor location. To delete that planned orders you need to run SNP heuristic at vendor location then SNP:DepDmd elements will be get deleted if there is no requirement.</p><p><img
src="https://lh6.googleusercontent.com/-aRIYbUB1tSI/T59l7pqAv8I/AAAAAAAAARo/H9MGdsCxC0U/s814/SNP%2520PL-ORD.jpg" alt="SNP:PL-ORD" /></p><p><em>If the orders are not deleted after run SNP heuristic. Why?</em></p><p><img
src="https://lh3.googleusercontent.com/-V3LbhgxvOpg/T59l6Tsav0I/AAAAAAAAARY/epAICDQ9e9c/s557/pp-firmed-indicator-sap.jpg" alt="pp-firmed indicator sap" /></p><p>The planned orders are selected the PP-Firmed indicator hence when you are trying to delete those it does not. So that is the reason it is not able to delete that planned orders. Thus to remove PP-Firmed indicator, go inside that planned order then remove the tick on output firmed and pressed enter and automatically the tick on PP-firmed gets removed. Run SNP heuristic again, the orders will be deleted by running heuristic on the product location combination using <em>/SAPAPO/SNP01</em> transaction.</p><p><strong>Other way to delete SNP:PL-ORD elements</strong></p><p>SNP:PL-ORD elements can be deleted by using <em>/SAPAPO/RLCDEL</em> transaction. You can specify selection parameters as below:</p><p><img
src="https://lh5.googleusercontent.com/-leaWxzM-2TY/T59l61UOg4I/AAAAAAAAARg/eoZfd6dcGUQ/s540/sapapo%2520rlcdel.jpg" alt="/SAPAPO/RLCDEL" /></p><p>• Select Object: By Categories → Choose ES (<a
href="http://erphelpdesks.com/category-description-in-sap-apo.html"  title="Category ES" target="_blank">What is ES mean?</a>)<br
/> • Manual Selection: Specify Planning Version, Product Number, Location</p><p>If you find any questions, please feel free to share me&#8230; And also welcome any comments.</p> <strong>RECENT SEARCH TERMS</strong><br
/> • /sapapo/rrp4 pp-firmed • deleting material in snp view • how to delete depdmd from product view in apo? • how to delete product grn in sap]]></content:encoded> <wfw:commentRss>http://erphelpdesks.com/how-to-delete-snpdepdmd-objects-in-apo.html/feed</wfw:commentRss> <slash:comments>0</slash:comments> </item> <item><title>RFUMSV00 Transaction</title><link>http://erphelpdesks.com/rfumsv00-transaction-sap.html?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=rfumsv00-transaction-sap</link> <comments>http://erphelpdesks.com/rfumsv00-transaction-sap.html#comments</comments> <pubDate>Sat, 28 Apr 2012 17:03:51 +0000</pubDate> <dc:creator>ERP</dc:creator> <category><![CDATA[ERP Solutions]]></category> <category><![CDATA[rfumsv00 report sap]]></category> <category><![CDATA[thailand tax number change]]></category> <category><![CDATA[vat registration number in sap]]></category> <guid
isPermaLink="false">http://erphelpdesks.com/?p=982</guid> <description><![CDATA[This is continue from previous post&#8230; RFUMSV00 program is one that related to Thailand Legal Change of Tax ID length changed (another one is RFIDYYWT). If you do not have authorization to access SE38 or SA38 transaction to access RFUMSV00...]]></description> <content:encoded><![CDATA[<p>This is continue from previous post&#8230; <strong>RFUMSV00</strong> program is one that related to Thailand Legal Change of Tax ID length changed (another one is <a
href="http://erphelpdesks.com/sap-tax-number-length-changed-to-13-digits-thailand.html"  title="TH Tax Number Length Changed to 13 digits" target="_blank">RFIDYYWT</a>). If you do not have authorization to access SE38 or SA38 transaction to access RFUMSV00 program. Then&#8230; What is its transaction code?</p><p><strong>S_ALR_87012357</strong> transaction can be used. Note <strong>1687572</strong> need to be implemented to update report RFUMSV00 to display the VAT Registration number of the company with 13 digits as maintained in the Company&#8217;s Master Data.</p><p>RFUMSV00 program creates the advance return for tax on sales/purchases (if required, a batch input session can be created) for automatic transfer posting of tax payable. It is used to report the month taxable sales and purchases. We use it as a basis for our VAT declaration to the Tax authorities in your country. With the RFUMSV00 report you can offset your input and output sales tax to a net payable or receivable account in your balance sheet.</p><p>More information: <a
target="_blank" rel="nofollow" href="http://erphelpdesks.com/goto/http://help.sap.com/saphelp_ish471/helpdata/EN/8e/051f2bc925d311b60f0060b03c2bff/content.htm" rel="nofollow"  target="_blank">http://help.sap.com/saphelp_ish471/helpdata/EN/8e/051f2bc925d311b60f0060b03c2bff/content.htm</a></p> <strong>RECENT SEARCH TERMS</strong><br
/> • what is vat registration number insap • vat registration number in sap erp • change tax id for thailand sap • vietnam vat registration number rfumsv00 report • vat number in sap transaction • to search sap VAT registration number of vendor • sap user advanced transaction • sap sregistration transaction • sap rfumsv00 batch input • sap reverse vat advance return on sales • rfumsv00 vat number • rfumsv00 display document number • RFUMSV00 authorization • how to use transaction report vat register sap • how to represent the vat registration location in sap • best way to extend rfumsv00 • advance vat sap]]></content:encoded> <wfw:commentRss>http://erphelpdesks.com/rfumsv00-transaction-sap.html/feed</wfw:commentRss> <slash:comments>0</slash:comments> </item> <item><title>TH Tax Number Length Changed to 13 digits</title><link>http://erphelpdesks.com/sap-tax-number-length-changed-to-13-digits-thailand.html?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=sap-tax-number-length-changed-to-13-digits-thailand</link> <comments>http://erphelpdesks.com/sap-tax-number-length-changed-to-13-digits-thailand.html#comments</comments> <pubDate>Mon, 23 Apr 2012 16:03:01 +0000</pubDate> <dc:creator>ERP</dc:creator> <category><![CDATA[ERP Solutions]]></category> <category><![CDATA[thailand tax number change]]></category> <category><![CDATA[vat registration number in sap]]></category> <guid
isPermaLink="false">http://erphelpdesks.com/?p=972</guid> <description><![CDATA[As Thailand Legal Change of Tax ID length changed: 1. The length of VAT Registration Number of Company Code is changed from 10 digits to 13 digits. 2. The length of Tax Identification Number of vendor is changed from 10...]]></description> <content:encoded><![CDATA[<p>As <strong>Thailand Legal Change of Tax ID length changed</strong>:</p><p>1. The length of VAT Registration Number of Company Code is changed from 10 digits to 13 digits.<br
/> 2. The length of Tax Identification Number of vendor is changed from 10 digits to 13 digits.<br
/> 3. The format of PND3 and PND53 forms is changed.<br
/> 4. The personal ID field is removed from form IDWTREPT_TH_1</p><p>SAP provides solution that the VAT Registration (STCEG) field can be used to update the new VAT Registration number of the company in Mater Data of a company using OBY6 transaction (• Financial Accounting Global Settings • Company Code • Enter Global Parameters).</p><p>For customer and vendor master, tax Number 1 cannot be used because it is for personal ID and links to withholding tax form for personal withholding tax. VAT reg.no. also cannot be used due to we need this field to maintain tax number for company who has VAT registered (for company without VAT registration will leave it blank).</p><p>SAP release the solution as following:</p><p><strong>Note 1687572</strong> &#8211; Implement this note, report RFUMSV00 will display the VAT Registration number of the company with 13 digits as maintained in the Company&#8217;s Master Data.</p><p><strong>Note 1686208</strong> &#8211; Implement this note for Report RFIDYYWT</p><p><strong>Note 1681250</strong> &#8211; Implement this note to update tax no. in customer / vendor master to 13 digits. Activate Tax Number 3 field. It can be used to update the new tax number. Report would check and display tax data from tax number 2 (STCD2) in case tax number 3 (STCD3) is not updated in the corresponding vendor / customer master. This case is valid for those customers who have not received new TAX ID number from the government and existing Tax ID is valid.</p><p>Hope this information is useful <img
src='http://erphelpdesks.com/wp-includes/images/smilies/icon_smile.gif' alt=':)' class='wp-smiley' /> .. Please share me if any information is missing.</p><p><strong><u>How to maintain Thailand&#8217;s Tax ID of a company code in SAP system</u></strong></p><p><em>SAP VAT registration number configuration</em> &#8211; Maintaining of a VAT reg.no.is only possible for company codes in EC countries. The following are the steps to update company code&#8217;s tax ID in VAT Registration No. field in configuration (Enter Global Parameters (OBY6) &#8211; SAP company code VAT registration number)</p><p>1. In Customizing for SAP NetWeaver, choose • General Settings • Set Countries • Define Countries in mySAP.com Systems.<br
/> 2. Select country &#8220;TH&#8221; for Thailand.<br
/> 3. Select EU Country indicator.</p><p><img
src="https://lh4.googleusercontent.com/-mJl6sHOuQJU/T5V8TWGdiGI/AAAAAAAAARE/f3ViI00O0Lk/s591/Enter%2520Global%2520Parameters%2520OBY6.jpg" alt="Enter Global Parameters OBY6 SAP"></p><p>4. Go back to the Implementation Guide (IMG) screen, then, in Customizing for Financial Accounting (FI), choose Financial Accounting Global Settings • Company Code • Enter Global Parameters.<br
/> 5. Select your company code.<br
/> 6. In the VAT Registration No. field, enter TH followed by your tax ID, for example, TH123456789123.<br
/> 7. Go back in Customizing for SAP NetWeaver again, choose • General Settings • Set Countries • Define Countries in mySAP.com Systems. and deselect EU country indicator.<br
/> 8. Save your settings.</p> <strong>RECENT SEARCH TERMS</strong><br
/> • sap change tax numbers 10 digits to 13 digits step by step • sap note 1687572 • sap change company code tax id • sap accounting • tax id 13 digit sap note • rfidyywt taxid in sap abap • sap change tax 13 digits • vat registration number thailand • thai tax id 10 digit to 13 • where is account indicator in sap • sap thailand tax id 13 • tax identification numbers in other countries vat • vat number thailand • tax id change 10 digits • tax id 10 digit will change to 13 digit • tax change to 13 digits sap • steps to maintain the vat reg no in sap • tax id length • show tax identification number in sap order • sap vat reg no must have the length 11]]></content:encoded> <wfw:commentRss>http://erphelpdesks.com/sap-tax-number-length-changed-to-13-digits-thailand.html/feed</wfw:commentRss> <slash:comments>1</slash:comments> </item> <item><title>Planning Calendar In SAP APO</title><link>http://erphelpdesks.com/planning-calendar-in-sap-apo.html?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=planning-calendar-in-sap-apo</link> <comments>http://erphelpdesks.com/planning-calendar-in-sap-apo.html#comments</comments> <pubDate>Wed, 18 Apr 2012 15:24:04 +0000</pubDate> <dc:creator>ERP</dc:creator> <category><![CDATA[SAP Advanced Planning and Optimization]]></category> <category><![CDATA[calendar sap apo]]></category> <guid
isPermaLink="false">http://erphelpdesks.com/?p=965</guid> <description><![CDATA[Today I found the difference of planned independent requirement between R3 and APO system, It is because of the overlap of days in the beginning and end of the month. For this case, R3 is calculated in 6 workdays and...]]></description> <content:encoded><![CDATA[<p>Today I found the difference of planned independent requirement between R3 and APO system, It is because of the overlap of days in the beginning and end of the month. For this case, R3 is calculated in 6 workdays and APO is calculated in calendar days (7 workdays).</p><p>Hence there is some discrepancy between 2 systems. However, if compare the demand numbers in weeks so I will find the match exactly.</p><p>So I need to understand more about planning calendar setting in SAP APO (MD27 transaction is used to maintain planning calendar in R/3).</p><p>The <u>calendar data</u> is maintained as part of the location master data. The Maintain Planning Calendar (Time Stream) is prerequisite step before maintaining calendar data. The time stream can be set up in weekly or monthly periods.</p><p>SPRO • Advanced Planning and Optimization • Master Data • Calendar • Maintain Planning Calendar (Time Stream)</p><p>The following fields are provided on the <em>Calendar</em> tab page of Location Master Data (/N/SAPAPO/LOC3):</p><p><img
src="https://lh3.googleusercontent.com/-AZkTg6yZYvk/T47bszatAKI/AAAAAAAAAQo/wmi0pUZ1h0A/s551/calendar_location_sap_apo.jpg" alt="calendar in location master" /></p><p><strong>Production Calendar</strong><br
/> The production calendar is used to schedule production activities. A production calendar valid for the entire production is assigned to a location.</p><p><strong>Warehouse Calendar</strong><br
/> The warehouse calendar is created for the scheduling of warehousing/storage activities. A warehouse calendar regulating the accessibility of a storage facility for stock putaway and removal purposes is assigned to a location.</p><p><strong>Shipping Calendar</strong><br
/> The shipping calendar is used to schedule shipping activities. A shipping calendar valid for the entire shipping function is assigned to a location.</p><p><strong><u>Maintain Planning Calendar (Time Stream) Steps</u></strong></p><p><img
src="https://lh6.googleusercontent.com/-_qzmZ2FNXnQ/T47btPEXo-I/AAAAAAAAAQs/ZSNMuHYJY8E/s569/planning_calendar_in_sap_apo.jpg" alt="planning calendar in sap apo" /></p><p>1. Enter a unique name for the time stream (calendar), and choose Create. The Change Planning Calendar screen appears.</p><p>2. Enter a short description for the time stream.</p><p>3. Enter how many years into the past the calendar is to extend. This setting is optional.</p><p>4. Enter how many years into the future the calendar is to extend. If you do not make an entry in this field, the system considers the current year only.</p><p>5. Use the input help to select the time zone for the location to which this calendar is assigned.</p><p>6. Select one of the following calendar options, depending on the location or transportation lane associated with this calendar:</p><ul>• Factory calendar (with gaps)<br
/> • Period calendar (without gaps)</ul><p>7. Use the input help to select a pre-defined calendar.</p><p>8. Choose Periods to define the periods for this calendar.</p><p>9. Select the required time interval (week or month). The interval is displayed in weeks or months accordingly.</p><p>10. The information you enter in this step depends on whether you selected week or month for the time interval:</p><ul>• If you selected week, assign numbers 1 &#8211; 7 (1 for Monday, 2 for Tuesday, and so on) to the periods and enter the required times.<br
/> • If you selected month, assign numbers 1 &#8211; 5 in the first column for the weeks in a month, and number 1 &#8211; 7 in the second column for the days of the week. Enter the required times.</ul><p>11. Choose Periods to generate the periods. You always have to generate the periods again when you have changed the calculation rules.</p><p>12. Choose Save.</p> <strong>RECENT SEARCH TERMS</strong><br
/> • SAP APO calendar • sap period calendar without gaps • sap r3 planning calendar • factory calendar with shift on 2nd week of a month in sap • sap apo calendar overlaping periods • sap apo calendar part • sap apo location master warehouse calendar • sap apo transportation calendar • sap apo:location master additional fields in apo • sap md04 views planning calendar • apo calendar days • sap planning production calendar • sap shipping calendar • sap time stream transaction • time stream calendar • what is snp planning calendar • r/3 to apo calendar integration • planning calendar with week gap sap • planning calendar with different interval sap • apo calendar sap]]></content:encoded> <wfw:commentRss>http://erphelpdesks.com/planning-calendar-in-sap-apo.html/feed</wfw:commentRss> <slash:comments>0</slash:comments> </item> <item><title>Goods Receipt with Delivery Completed Indicator in PO</title><link>http://erphelpdesks.com/goods-receipt-delivery-completed-indicator-po-sap.html?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=goods-receipt-delivery-completed-indicator-po-sap</link> <comments>http://erphelpdesks.com/goods-receipt-delivery-completed-indicator-po-sap.html#comments</comments> <pubDate>Fri, 23 Mar 2012 05:18:30 +0000</pubDate> <dc:creator>ERP</dc:creator> <category><![CDATA[ERP Solutions]]></category> <category><![CDATA[delivery completed indicator gr]]></category> <category><![CDATA[delivery completed indicator in sap mm]]></category> <guid
isPermaLink="false">http://erphelpdesks.com/?p=897</guid> <description><![CDATA[The &#8216;delivery completed&#8217; indicator has been set in the purchase order item. However, the system still proposes a quantity and allows you to post goods receipt using MIGO transaction or MB01 transaction against the purchase order. This indicator specifies whether...]]></description> <content:encoded><![CDATA[<p><em>The &#8216;delivery completed&#8217; indicator has been set in the purchase order item. However, the system still proposes a quantity and allows you to post goods receipt using MIGO transaction or MB01 transaction against the purchase order.</em></p><p>This indicator specifies whether a purchase order item is considered as completed and closed. This means that no more goods receipts are <u>EXPECTED</u> for this item. If this indicator is set, the open purchase order quantity becomes zero, even if the full quantity has not been delivered.</p><p>The fact that the system proposes the quantity that was ordered but has not yet been delivered is the standard system response. No program correction is available since this is standard system behavior. Setting the &#8216;delivery completed&#8217; indicator has the following effects:</p><ul>1. The purchase order item is considered as completed and can be deleted even if not the entire quantity was delivered.<br
/> 2. A further delivery is not expected. This affects material requirements planning (materials planning) and purchase order commitment. However, another delivery up to the purchase order quantity (including overdelivery tolerance) is still possible.</p><p>3. During the next goods receipt, the system does not select the item as a proposal in the selection list in Transaction MB01. In Transaction MIGO, the system does not propose the &#8216;OK&#8217; indicator even if it would normally be proposed due to the user settings.</ul><p>According to solution in <strong>Note 856279 (MIGO: Proposed qty despite &#8216;delivery completed&#8217; indicator)</strong></p><p>To stop the system from proposing a quantity in Transactions MB01 or MIGO and to prevent a GR posting, you can proceed as follows:</p><ul>1. Reduce the purchase order quantity to the previous GR quantity.</p><p>2. Block the purchase order item. (ME22N: Block pushbutton; ME22 Menu → Edit → Block)</p><p>3. Fill the date field for the <u>&#8216;Latest Possible Goods Receipt&#8217;</u> (LEWED) in the purchase order item. If you do this and you enter a GR document after this date, the system issues message M7163, which you must set as an error message in Customizing.</p><p>4. Under &#8220;Purchasing &#8211; Environment Data &#8211; Define Attributes of System Messages&#8221; add Application Area 06 and Message Number 744 from warning to error.</ul><h3>Set &#8220;Delivery Completed&#8221; Indicator in Customizing</h3><p>The &#8220;<a
href="http://erphelpdesks.com/delivery-completed-indicator-in-po-sap.html"  title="Delivery Completed Indicator in PO" target="_blank">Delivery Completed</a>&#8221; indicator can be specified as the system automatically suggests the inward delivery completed indicator for goods receipts if the delivered quantity lies within the under/overdelivery tolerance.</p><p>SPRO → Materials Management → Inventory Management and Physical Inventory → Goods Receipt → Set &#8220;Delivery Completed&#8221; Indicator</p><p>The &#8220;inward delivery completed&#8221; indicator has the following effects:</p><p>• The item is regarded as closed, even if the total quantity was not delivered.<br
/> • A further delivery is not expected, may, however, arrive.<br
/> • In the next goods receipt, the item appears on the selection list but has no selection indicator.<br
/> • The item can be reorganized even if the total quantity has not been delivered.</p><p>More information about delivery completed indicator can be find in <strong>SAP Note 1093582 &#8211; FAQ: Delivery complete indicator ELIKZ</strong>.</p> <strong>RECENT SEARCH TERMS</strong><br
/> • delivery completed indicator in sap mm • sap mm gr effect • sap mr11 po delivery complete • sap po delivery complete indicator • goods receipt after delivery completion indicator • table for open gr qty in sap • Goods Receipt • complete delivery note • sap deliv compl did not po close correctly • delivery complete in PO set but delivery complete in material document not set • migo delivery note table • delivery completed indicator in spa • sap delivery completed indicator configuration • delivery completed indicator purchase order sap • flag dans transaction mb01 sap • item ok goods receipt migo table field sap • latest possible goods receipt in po • sap md04 and Expected Goods Receipt • how to find only grn purchase order and quantity in sap • automatic delivery complete indicator in po sap]]></content:encoded> <wfw:commentRss>http://erphelpdesks.com/goods-receipt-delivery-completed-indicator-po-sap.html/feed</wfw:commentRss> <slash:comments>1</slash:comments> </item> <item><title>Maintain Time Profiles /SAPAPO/CDPSC4</title><link>http://erphelpdesks.com/maintain-time-profiles-sapapocdpsc4.html?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=maintain-time-profiles-sapapocdpsc4</link> <comments>http://erphelpdesks.com/maintain-time-profiles-sapapocdpsc4.html#comments</comments> <pubDate>Thu, 22 Mar 2012 15:07:04 +0000</pubDate> <dc:creator>ERP</dc:creator> <category><![CDATA[SAP Advanced Planning and Optimization]]></category> <category><![CDATA[sap apo tutorial free]]></category> <guid
isPermaLink="false">http://erphelpdesks.com/?p=893</guid> <description><![CDATA[The time profile can be used to specify a period for planning. But not all functions or heuristics consider the time profile. Material requirement planning function is an example. MRP occurs independently of the time profile for all requirements in...]]></description> <content:encoded><![CDATA[<p>The <strong>time profile</strong> can be used to specify a period for planning. But not all functions or heuristics consider the time profile. <a
href="http://erphelpdesks.com/material-requirement-planning-in-ecc.html"  title="Material Requirement Planning in ECC" target="_blank">Material requirement planning</a> function is an example. MRP occurs independently of the time profile for all requirements in the PP/DS horizon.</p><p>Time profile can be configured in Customizing of Detailed Scheduling or go to /SAPAPO/CDPSC4 transaction directly.</p><p>Period Type for Definition of Display and Planning Period can be defined in the following ways:</p><p><u>Relative</u></p><p>Here you define the start date and finish date in relation to the current date, for example, the start date lies 10 weeks in the past (-10) and 40 weeks in the future (40). You therefore enter a number of periods for the start and for the finish date.</p><p><u>Absolute</u></p><p>Here you enter the start date and the finish date as an absolute value in the set period type, for example, for the start date 011999 (calendar week 1 in year 1999) and for the finish date 501999 (calendar week 50 in year 1999).</p><p>For performance reasons, you should keep the display period as short as possible.</p> <strong>RECENT SEARCH TERMS</strong><br
/> • sap apo tutorials • APO weeks to start on sunday • weeks starting on sunday apo • week start sunday sap apo • sap cif certification material - ---- • sap apo wjat is definition of period factor • sap apo tutor files • sap apo ppm example • sap apo configuration guide • produkt planning erp scheduling heuristic • period type in sap apo • heuristic types in sap apo • free tutorials production and planning • free sap apo tutorial • free erp apo • deallocating a recource in apo • APO what is production horizon • what planning profile does sap mm]]></content:encoded> <wfw:commentRss>http://erphelpdesks.com/maintain-time-profiles-sapapocdpsc4.html/feed</wfw:commentRss> <slash:comments>0</slash:comments> </item> <item><title>List Pending POs By Requestor</title><link>http://erphelpdesks.com/list-pending-pos-by-requestor-sap.html?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=list-pending-pos-by-requestor-sap</link> <comments>http://erphelpdesks.com/list-pending-pos-by-requestor-sap.html#comments</comments> <pubDate>Wed, 21 Mar 2012 06:17:39 +0000</pubDate> <dc:creator>ERP</dc:creator> <category><![CDATA[ERP Solutions]]></category> <category><![CDATA[pending po list sap]]></category> <category><![CDATA[pending po report in sap]]></category> <guid
isPermaLink="false">http://erphelpdesks.com/?p=891</guid> <description><![CDATA[Once purchase order created in R/3 from shopping cart created in SRM system. SAP ID of requester will be in Recipient field in Account Assignment tab of purchase order. Information in recipient field defines Goods Recipient/Ship-To Party. It specifies the...]]></description> <content:encoded><![CDATA[<p><em>Once purchase order created in R/3 from shopping cart created in SRM system. SAP ID of requester will be in Recipient field in Account Assignment tab of purchase order.</em></p><p>Information in recipient field defines Goods Recipient/Ship-To Party. It specifies the recipient for whom the material or the service is destined.</p><p>To list all pending POs which created by requester, go to table EKPO (item information) thru SE16 transaction, for example:</p><p><img
src="https://lh4.googleusercontent.com/-_41RQXkuIpg/T2tBJB0Y_VI/AAAAAAAAAVw/wpVt-WS0zg4/s591/ekpo-pending-po-sap.jpg" alt="ekpo pending po sap" /></p><p>The parameters above list all pending purchase orders of company code:1000 which created by User: SAPID001 during 01 Jan 2009 to 21 March 2012. Exclude PO items which have been flagged for deletion (Deletion Ind.: L), and exclude item which flagged Deliv. Compl.</p><p>To find open GR and IR quantity, you can export PO numbers from table EKPO then go to ME2N transaction with those POs. Then you will get more information about your pending POs such as Still to be delivered Qty and Still to be invoiced Qty.</p><p><img
src="https://lh4.googleusercontent.com/-b1QECtWyCYU/T2tBJAXQ6LI/AAAAAAAAAV0/q8MkaXkxXzs/s632/me2n-sap.jpg" alt="me2n sap" /></p><p>In addition, EKET table which contains purchase order schedule line wise schedule qty (EKET-MENGE) and delivered qty (EKET-WEMNG). MENGE &#8211; WEMNG = open qty.</p><p>Scheduled Quantity is quantity to be delivered by the vendor in respect of this schedule line.</p><p>Quantity of Goods Received specifies the quantity already delivered to date for this item or schedule line.</p><p>In case you need to find the pending PRs in SAP system instead.. see <a
href="http://erphelpdesks.com/how-to-check-open-purchase-requisition.html"  title="How to Check Open Purchase Requisition" target="_blank">How to Check Open Purchase Requisition</a></p> <strong>RECENT SEARCH TERMS</strong><br
/> • pending po list sap • table still to deliver amount or qty for a purchase order sap • how to know pending requisitions in sap • how to find purchase item in sap mm • how to find pending purchase order sap • how to list pending po by requrestor sap • pending po report in abap • pending po report in sap • still to be delivered sap • list the purchase order recipient sap • list of pending pos • Where do I find the PO number on SRM • sap : how to find the still to be delivery quantity in the po • why erp request contain the address of erp requestor also • sap open purchase order quantity eket • sap list pr delivered • SAP list production order received • sap mm open po report • sap po free item table • sap po by requester code]]></content:encoded> <wfw:commentRss>http://erphelpdesks.com/list-pending-pos-by-requestor-sap.html/feed</wfw:commentRss> <slash:comments>0</slash:comments> </item> <item><title>Material Master Changes Report</title><link>http://erphelpdesks.com/material-master-changes-report-sap.html?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=material-master-changes-report-sap</link> <comments>http://erphelpdesks.com/material-master-changes-report-sap.html#comments</comments> <pubDate>Tue, 20 Mar 2012 15:39:50 +0000</pubDate> <dc:creator>ERP</dc:creator> <category><![CDATA[ERP Solutions]]></category> <category><![CDATA[material master change history table]]></category> <category><![CDATA[material master changes table sap]]></category> <guid
isPermaLink="false">http://erphelpdesks.com/?p=884</guid> <description><![CDATA[To display the changes made to material master. Yes, we can use MM04 transaction or select &#8216;display change&#8217; in menu bar in material master but is there other ways to help us for checking the material master change log? The...]]></description> <content:encoded><![CDATA[<p><em>To display the changes made to material master. Yes, we can use MM04 transaction or select &#8216;display change&#8217; in menu bar in material master but is there other ways to help us for checking the material master change log?</em></p><p>The CDHDR and CDPOS table collect changes made to material masters (table MARA). You can see what changes are made by using these two tables CDHDR (header) and CDPOS (items).</p><p>You can select by specific the fields such as OBJECTCLAS, OBJECTID and CHANGE_IND to get CHANGENR. The date, time, user, and field changed are saved in CDPOS table, along with the the old value and the new value of the changed field.</p><p>For example, to see changes made to field MATERIAL on table MARA, read table CDHDR where</p><p>CDHDR-OBJECTCLAS = &#8216;MATERIAL&#8217;<br
/> CDHDR-OBJECTID = &#8216;your material number&#8217;<br
/> CDHDR-UDATE = SY-DATUM or your choice of date<br
/> CDHDR-TCODE = &#8216;MM02&#8242;<br
/> CDHDR-CHNGIND = &#8216;U&#8217;</p><p><img
src="https://lh5.googleusercontent.com/-yELPzDaqsGk/T2ijjiS2loI/AAAAAAAAAQE/fVARngfzU6Y/s625/cdhdr-table-sap.jpg" alt="cdhdr material master changes table sap" /></p><p>Using values from CDHDR table, you can get the information from CDPOS table where, for example,</p><p>CDPOS-OBJECTCLAS = &#8216;MATERIAL&#8217;<br
/> CDPOS-TABNAME = &#8216;MARA&#8217;<br
/> CDPOS-OBJECTID = CDHDR-OBJECTID<br
/> CDPOS-CHANGENR = CDHDR-CHANGENR<br
/> CDPOS-FNAME = &#8216;your field name&#8217; wanted<br
/> CDPOS-VALUE NEW<br
/> CDPOS-VALUE OLD</p><p><img
src="https://lh3.googleusercontent.com/-ju2vkR4OWm0/T2ijjq74VuI/AAAAAAAAAQI/pC3ChASFmKM/s599/cdpos-table-sap.jpg" alt="cdpos material master changes table sap item" /></p><p>Or Try to run Program <strong>RSSCD100</strong> with Object Class &#8216;MATERIAL&#8217;. It will give us more information in regard to old and new value.</p><p><u><strong>Useful Material Master Tables:</strong></u></p><p>MARA – Material Master (MATNR)<br
/> MARC – Material Master with Plant Data (MATNR, WERKS)<br
/> MARD – Material Master with Storage Location Data (MATNR, LGORT, WERKS)<br
/> MAKT – Material Master Material Descriptions (MATNR, MATKL)<br
/> MBEW – Material Valuation Data (MATNR, BWTAR)<br
/> MVKE – Material Master : Sales related Data<br
/> MDKP, MDTB – MRP related Data( Header, Item)<br
/> MCHA, MCHB – Material Batches (Header, Item) (MATNR, WERKS, LGORT, CHARG)</p><p>For configuration change log, you can find in this post..<a
href="http://erphelpdesks.com/how-to-check-change-log-of-configuration-dbtablog.html"  title="How to Check Change Log of Configuration" target="_blank">How to Check Change Log of Configuration</a></p> <strong>RECENT SEARCH TERMS</strong><br
/> • sap rsscd100 • sap in wicht table i can get aditional data of material master data • sap table for material master changes • material master change report sap • material master change report • change log for material master in sap • rsscd100 • sap cdhdr material master number • run a program guide RSSCD100 • sap material master data list report • sap material master change report • cdhdr • sap lgort change • sap material master marc changes • sap made a report update table • sap how to see the changes on a material • sap get equipment number matnr werks • sap material master change log • sap mara abort added fields • sap mard dump]]></content:encoded> <wfw:commentRss>http://erphelpdesks.com/material-master-changes-report-sap.html/feed</wfw:commentRss> <slash:comments>0</slash:comments> </item> <item><title>Detailed Scheduling Heuristics in APO</title><link>http://erphelpdesks.com/detailed-scheduling-heuristics-in-apo.html?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=detailed-scheduling-heuristics-in-apo</link> <comments>http://erphelpdesks.com/detailed-scheduling-heuristics-in-apo.html#comments</comments> <pubDate>Thu, 15 Mar 2012 15:41:29 +0000</pubDate> <dc:creator>ERP</dc:creator> <category><![CDATA[SAP Advanced Planning and Optimization]]></category> <category><![CDATA[detailed scheduling and planning]]></category> <category><![CDATA[sap apo tutorial free]]></category> <guid
isPermaLink="false">http://erphelpdesks.com/?p=838</guid> <description><![CDATA[DS heuristic &#8211; Heuristic for detailed scheduling (DS). For example, DS heuristics are used to specify the processing sequence of operations for a resource. Detailed Scheduling Heuristics in APO can only reschedule or deallocate orders and operations that start within...]]></description> <content:encoded><![CDATA[<p><em>DS heuristic &#8211; Heuristic for detailed scheduling (DS). For example, DS heuristics are used to specify the processing sequence of operations for a resource.</em></p><p><strong>Detailed Scheduling Heuristics in APO</strong> can only reschedule or deallocate orders and operations that start within the planning period.</p><p>The system must schedule deallocated operations or orders to be newly created so that the start date is within the planning period.</p><p>• <em>Reschedule</em> activity is used to determine a new date or new resources for a scheduled operation, on which the operation should be processed.</p><p>With rescheduling, the operation still occupies the resources; after rescheduling it occupies either the previous resources or the new resources. Rescheduling an order means rescheduling the operations of an order.</p><p>• <em>Deallocate</em> activity in which an operation is removed from the resource schedule. With deallocation, an operation is given the status deallocated; the operation no longer occupies any resources.</p><p>• <em>Schedule</em> activity for newly created or deallocated operations, which is used to:</p><ul>- determine the resources to be used to process an operation</p><p>- determine the date when the operation should be processed on the resource</ul><p>With scheduling, the operation occupies the resource. Scheduling an order means scheduling all the operations of an order. 0800572600</p> <strong>RECENT SEARCH TERMS</strong><br
/> • detailed scheduling heuristics • APO heuristics • sap apo detailed scheduling example • sap apo free tutorial • sap apo heuristics • apo detailed scheduling • process scheduling erp heuristic • sap apo rescheduling • sap detailed scheduling with erp • sapo apo scheduling heuristic • what is Heuristic in APO • on location heuristic in apo flowchart • nd materials apo ppm • heuristics in apo • apo ds heuristic • detailed scheduling example in apo • detailed scheduling in apo • ds heuristics alternate resources • examples of resource scheduling heuristics • free sap tutorial on routing]]></content:encoded> <wfw:commentRss>http://erphelpdesks.com/detailed-scheduling-heuristics-in-apo.html/feed</wfw:commentRss> <slash:comments>0</slash:comments> </item> <item><title>Production Version Is Not Valid</title><link>http://erphelpdesks.com/production-version-is-not-valid-sap.html?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=production-version-is-not-valid-sap</link> <comments>http://erphelpdesks.com/production-version-is-not-valid-sap.html#comments</comments> <pubDate>Thu, 15 Mar 2012 03:27:51 +0000</pubDate> <dc:creator>ERP</dc:creator> <category><![CDATA[ERP Solutions]]></category> <category><![CDATA[production data structures]]></category> <category><![CDATA[production version sap]]></category> <guid
isPermaLink="false">http://erphelpdesks.com/?p=832</guid> <description><![CDATA[Production version XXX is not valid &#8211; During the conversion of planned orders from SAP APO system, the queue to R/3 stuck. For example scenario, this is related to finish goods material which will change the packaging design and still...]]></description> <content:encoded><![CDATA[<p><em>Production version XXX is not valid &#8211; During the conversion of planned orders from SAP APO system, the queue to R/3 stuck.</em></p><p>For example scenario, this is related to finish goods material which will change the packaging design and still use current material number.</p><p>Currently, If we maintain the end valid date for current version and then start new version after current version.</p><p>Example, Production version 0001, valid to date is 03.31.2012 and start new version 0002 on 04.01.2012 with new packaging design.</p><p>When there is any delayed in project timeline, planner will move graph in PPDS, then sometimes some plan order may move back and over the end valid date. Then the issue is happened as &#8220;Planned order XXXX version 0001 is not valid on finish date 04.02.2012&#8243;.</p><p>The solution may be to set overlap of current production version and new version per scenario below.<br
/> Project timeline is to start new packaging design on Apr 1. We will set end valid date of version 0001 (current version) on Apr 15 (instead of Mar 31) and set version 0002 (new version) start on Apr 1 per project timeline.</p><p>Only implication of this setting is that during that period of overlap the system will create the <a
href="http://erphelpdesks.com/planned-order-sap-pp.html"  title="Planned Order in SAP" target="_blank">planned orders</a> on the first production version and the planners will have to keep a control on it (adopt the correct source of supply ) for the planned orders in that period.</p> <strong>RECENT SEARCH TERMS</strong><br
/> • delete planned order production version not sap • production version in sap transaction • production version not vaild sap • production version not valid • production version sap • when i maintain production version 0002]]></content:encoded> <wfw:commentRss>http://erphelpdesks.com/production-version-is-not-valid-sap.html/feed</wfw:commentRss> <slash:comments>0</slash:comments> </item> <item><title>Default Purchasing Group in Purchase Requisition</title><link>http://erphelpdesks.com/default-purchasing-group-in-purchase-requisition.html?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=default-purchasing-group-in-purchase-requisition</link> <comments>http://erphelpdesks.com/default-purchasing-group-in-purchase-requisition.html#comments</comments> <pubDate>Tue, 13 Mar 2012 15:42:50 +0000</pubDate> <dc:creator>ERP</dc:creator> <category><![CDATA[Material Management]]></category> <category><![CDATA[purchasing group in info record]]></category> <guid
isPermaLink="false">http://erphelpdesks.com/?p=828</guid> <description><![CDATA[While creating a purchase requisition and assigning the source (from a source list) automatically. The purchasing group value seems to be defaulted from the material master, not copied from the info record. Should it not default from the info record?...]]></description> <content:encoded><![CDATA[<p><em>While creating a purchase requisition and assigning the source (from a source list) automatically. The purchasing group value seems to be defaulted from the material master, not copied from the info record. Should it not default from the info record?</em></p><p>SAP system allows the <strong>purchasing group</strong> maintained in material master (purchasing view for that plant) is diffrent than the purchasing group which is maintained in info record.</p><p>Regarding OSS note 178306, the puchasing group you enter manually in a requisition is always overwritten with the purchasing group from material master.</p><p>Even after MRP run or manual purchase requistion creation process, purchasing group maintained in material master record will come as default , it overrides the entry of purchasing group maintained in info record.</p><p><strong>Purchasing group</strong> represents for the person and/or a group of person(s) who is/are responsible for purchasing activitites of a certain group of material. Hence, it is more logical that the purchasing group from the material master shall be used so that once the purchase requisition is generated, responsible team (with related purchasing group) will then group their own purchase requisition (using purchasing group as part of the selection parameters) for further processing in ME57 transaction.</p><p>It would then be subject to this/these responsible team(s) to determine how the purchase requisition shall be processed and since they are the team(s) who process(es) these purchase requisitions, the purchasing group from the purchase requisition shall be copied over into purchase order then.</p><p>Anyway, the purchasing group in the purchasing master data record (such as in info record or material master) is not critical to the entire process of PR processing (into RFQ and/or PO). Ideally the purchasing group in material and info record should be the same. &#8211; <em>Ha Tran</em></p> <strong>RECENT SEARCH TERMS</strong><br
/> • SAP Purchasing Group • sap mm requisition and purchasing group • transaction sap purchasing groups purchase order value • sap purchase group requisition • purchasing group in sap • sap pr po purchasing group • sap po price not default from info record • SAP po default prohasing group • sap pruchase requisition price for servcie master not copied to po • sap mm info record notes • sap mm info record • sap me57 default order type • sap default values for purchasing roup in sap • sap Copy Characteristic Values from the Purchasing Info Record • risk in using default purchasing groups mm sap • purchasing group not defaulting from info record • purchasing group inforecord and source list logic • purchasing group in sap mm • purchasing group in order sap • sap purcahse requsition purchasing group default]]></content:encoded> <wfw:commentRss>http://erphelpdesks.com/default-purchasing-group-in-purchase-requisition.html/feed</wfw:commentRss> <slash:comments>0</slash:comments> </item> <item><title>No Control Record for Business Proc.</title><link>http://erphelpdesks.com/no-control-record-for-business-proc.html?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=no-control-record-for-business-proc</link> <comments>http://erphelpdesks.com/no-control-record-for-business-proc.html#comments</comments> <pubDate>Sat, 10 Mar 2012 13:20:37 +0000</pubDate> <dc:creator>ERP</dc:creator> <category><![CDATA[ERP Solutions]]></category> <category><![CDATA[activity based costing sap]]></category> <guid
isPermaLink="false">http://erphelpdesks.com/?p=814</guid> <description><![CDATA[The error message &#8220;No control record for Business proc. XXXX/XXXXXXX in version 000 / 2012 activity planning/qty planning&#8221; come up while running cost estimate thru CK40N transaction (Costing Run). This error means you have to maintain Business Process Planning Quantities...]]></description> <content:encoded><![CDATA[<p>The error message &#8220;<u>No control record for Business proc. XXXX/XXXXXXX in version 000 / 2012 activity planning/qty planning</u>&#8221; come up while running cost estimate thru CK40N transaction (Costing Run).</p><p>This error means you have to maintain Business Process Planning Quantities / Prices in Activity Based Costing first. (Path below)</p><p><code>Accounting → Controlling → Activity-Based Costing → Planning → Process Quantities/Prices → Change</code></p><p><img
src="https://lh4.googleusercontent.com/-5fBepEqYi_A/T1tOCFyszAI/AAAAAAAAAPw/IdmOtxKUlPw/s878/No%2520control%2520record%2520for%2520Business%2520proc.jpg" alt="No Control Record for Business Proc." width="632" height="204" /></p><p>The plan activity/output prices in Activity Based Costing (ABC) will be maintained by using <strong>CP26</strong> transaction (Change Business Process Planning Quantities / Prices) whereas using <strong>KP26</strong> transaction (Change Activity Type / Price Planning) instead in Cost Center Accounting (CCA).</p><p><img
src="https://lh4.googleusercontent.com/-83UosL4LXwc/T1tOBuVSlgI/AAAAAAAAAPo/RiNamV8pEjs/s639/cp26-sap-transaction.jpg" alt="cp26 sap transaction" /></p><p><strong>What is Business process in Activity-Based Costing</strong></p><p>Process in a company that uses resources and can involve the activities of different departments. A business process can consume the output of multiple cost centers in a controlling area.</p><p><strong>Read more information</strong>:</p><p>• <a
target="_blank" rel="nofollow" href="http://erphelpdesks.com/goto/http://help.sap.com/erp2005_ehp_03/helpdata//EN/7e/cb742243a311d189ee0000e81ddfac/frameset.htm" rel="nofollow" target="_blank" >Planning Process Output (Quantities and Prices)</a><br
/> • <a
target="_blank" rel="nofollow" href="http://erphelpdesks.com/goto/http://help.sap.com/printdocu/core/print46c/en/data/pdf/COOMABC/COOMABC.pdf" rel="nofollow" target="_blank" >Activity Based Costing Document</a></p> <strong>RECENT SEARCH TERMS</strong><br
/> • No control record for Business proc • No control record for Activity type in version 000 / 2012 activity planning/qty planning • No records Business proc in version 000 / 2012 activity planning/qty planning • No control record for Business proc in version activity planning/qty planning • No control record for Business proc in version 000 / 2012 activity planning/qty planning • no business cp26 • no control record for activity type • no control record for activity planning • no control business proc sap • no contro record for activity type in version 000/2012 activity planning/qty planning in sap • no business process sap kp26 • sap control record]]></content:encoded> <wfw:commentRss>http://erphelpdesks.com/no-control-record-for-business-proc.html/feed</wfw:commentRss> <slash:comments>0</slash:comments> </item> <item><title>How to Exclude MRP Type ND from Integration Model</title><link>http://erphelpdesks.com/apo-exclude-mrp-type-nd-from-integration-model-sap.html?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=apo-exclude-mrp-type-nd-from-integration-model-sap</link> <comments>http://erphelpdesks.com/apo-exclude-mrp-type-nd-from-integration-model-sap.html#comments</comments> <pubDate>Fri, 09 Mar 2012 09:04:33 +0000</pubDate> <dc:creator>ERP</dc:creator> <category><![CDATA[SAP Advanced Planning and Optimization]]></category> <category><![CDATA[integration model sap apo]]></category> <category><![CDATA[sap apo tutorial free]]></category> <guid
isPermaLink="false">http://erphelpdesks.com/?p=803</guid> <description><![CDATA[I want to exclude material which been assign MRP Type &#8216;ND&#8217; from a Integration Model. How to do? How to Exclude MRP Type ND from CIF Model You can exclude materials from a cif model with the multiple selection function...]]></description> <content:encoded><![CDATA[<p>I want to exclude material which been assign MRP Type &#8216;ND&#8217; from a <strong>Integration Model</strong>. How to do?</p><p><strong><u>How to Exclude MRP Type ND from CIF Model</u></strong></p><p>You can exclude materials from a cif model with the <em>multiple selection</em> function directly in the integration model what you use for transfer.</p><p>When you activate materials give &#8216;<strong>ND</strong>&#8216; in the &#8216;<strong>Exclude values</strong>&#8216; of MRP type field in selection at <strong>CFM1</strong> transaction. So all materials with MRP type &#8216;ND&#8217; will not be included in the model.</p><p><img
src="https://lh6.googleusercontent.com/-xWCiIX4HzZM/T1nF9tkezEI/AAAAAAAAAPU/Yw7qI6maU8k/s751/Exclude%2520MRP%2520Type%2520ND%2520from%2520Integration%2520Model.jpg" alt="How to Exclude MRP Type ND from Integration Model" width="676" height="439" /></p><p><strong>Note</strong>:</p><p><code>If there are more than one integration model activated for that material then if you remove from one Integration Model, it will not get deactivated. In that case go to <strong>CFM5</strong> transaction select that material and plant then execute. You will find which all Integration Model are there for that. Then deactivate in those all Integration Model.</code></p><p>I will suggest that, instead of excluding MRP type &#8216;ND&#8217; , we can send the PDS with selection as, MRP type &#8216;X0&#8242; . Though I found some inactive BOM for material with MRP type &#8216;X0&#8242; . It will definitely reduce the failure occurrence of job.</p><p><strong>How to exclude specific materials from Integration Model</strong> Expert: <em>Dogboy49</em></p><p>All materials corresponding to a particular MRP type are in an integration model and the model is active. To exlude a specific material from this integration model even if it is having the same MRP type.</p><p>Use <strong>CFM1</strong> transaction. For each model affected, call up the affected variant. Go to the material field. Select Multiple selections (&#8216;right arrow&#8217;). Select the &#8216;Exclude values&#8217; tab (third tab). Enter the material or materials to be excluded. Copy (F10). The Save the variant. Execute the program to generate the (newly modified) model. Save the model.</p><p>Go to <strong>CFM2</strong>. Activate the newly generated model. Repeat for other affected models.</p><p>If the material previously been contained in active models, then the newly excluded master and transactional data will still exist in SCM. If you find it to be necessary to delete these data, then you need to go over to SCM and perform the necessary steps. Start with <strong>/SAPAPO/CCR</strong> to delete transactional data, then go to WUF to delete master data.</p> <strong>RECENT SEARCH TERMS</strong><br
/> • APO MRP TYpe • sap mrp code nd • sap cif how to integration model for material • sap cfm1 • removal of material from active integration model • integration model exclude field • how to remove mrp on sap • how to remove material from integration model cif sap • how to make mrp choose specific mrp types • how to get selection of integratrion model code sap • how do i exclude a material from mrp in sap • exclude nd material integration model sap • delete mrp in sap • delete integration models sap • deactivate integration models sap • cif integration model delivery type • apo selection profiles excluded values • sap report on mrp type]]></content:encoded> <wfw:commentRss>http://erphelpdesks.com/apo-exclude-mrp-type-nd-from-integration-model-sap.html/feed</wfw:commentRss> <slash:comments>1</slash:comments> </item> </channel> </rss>
